The A9 closes from Badhoevedorp to Holendrecht from 20:00 on 11 September until 05:00 on 14 September; the south-side Ouderkerk exit then stays closed through 26 October.

What you need to know

For an airport run or a return to Amstelveen, it is easy to save only “open again Monday morning.” The final kilometres are the catch: once the main carriageway returns, a familiar local exit still does not, so an apparently normal route can change near the destination. The weekend closure moves traffic into the new northern sunken carriageway and opens the next construction phase. The south-side Stadshart entry already has a longer restriction, while Ouderkerk’s south-side exit remains unavailable after the weekend. One journey therefore has two different planning periods. The A9 closes from Badhoevedorp to Holendrecht from 20:00 on 11 September until 05:00 on 14 September; the south-side Ouderkerk exit then stays closed through 26 October.



  • Full closure runs 11 September 20:00 to 14 September 05:00.
  • It covers Badhoevedorp–Holendrecht.
  • Ouderkerk south-side exit remains closed until 26 October.
  • Traffic moves into the new northern sunken section.
  • The A9 closes from Badhoevedorp to Holendrecht from 20:00 on 11 September until 05:00 on 14 September; the south-side Ouderkerk exit then stays closed through 26 October.


Hokimi field note:Set a reminder now for 11–14 September if you have a flight, shift or pickup. Recheck on departure day, then keep 26 October as a separate local-access date rather than assuming every ramp returns with the motorway.

Information verified on 18 August 2026 · Source1 · Source2

Check before you go

Dates, availability and external conditions can change. Confirm the latest information with the official source.

Why it may be useful

The A9 closes from Badhoevedorp to Holendrecht from 20:00 on 11 September until 05:00 on 14 September; the south-side Ouderkerk exit then stays closed through 26 October.

For users who want less searching and clearer information in English, Dutch or Chinese. Flights&Trans.

The A9 reopens Monday, but one exit does not
This supporting visual comes from real media on this public item.

Plan the next step

You will be redirected to the merchant or source site.

  • Valid until2026-10-26
  • Confirm with the official sourcerijkswaterstaat.nl

Check final price and availability on the merchant site.

View details · rijkswaterstaat.nl

Some links are affiliate links. The price is unchanged for you; Hokimi may earn a commission if you buy after clicking through.

You Might Also Like

View all →
The A1 becomes a moving work zone todayALLOW 30 MINUTES

The A1 becomes a moving work zone today

Check direction and exit first

Utrecht rail works change route each dayPLAN EXTRA TIME

Utrecht rail works change route each day

Allow about 35 extra minutes

A reserve release is not a pump-price buttonNO GUARANTEED PUMP DROP

A reserve release is not a pump-price button

No kerosene is being released

Two September Eurostar weekends need different plansCHECK SEPTEMBER TRAIN

Two September Eurostar weekends need different plans

Cancelled first, limited next

TRAVELPC does not discount every route equallyBOOK BY 20 AUG

TRAVELPC does not discount every route equally

Check the destination band first

The small word “from” matters most hereASIA FARES FROM AMS

The small word “from” matters most here

Fix your week before comparing

Love this deal?

No comments yet — be the first!