From 7 September 05:00 to 16 October 21:00, the A2 between Everdingen and Deil keeps three narrow lanes in each direction at 90 km/h; official extra travel time is about sixty minutes.

What you need to know

When a road is labelled open, few drivers budget an additional hour. Four lanes becoming three, close vehicle spacing and repeated braking can turn small daily queues into a predictable risk. The difficult part is not one diversion but recalculating every commute, pickup and north–south trip for six weeks. The project replaces fourteen kilometres of asphalt with quieter surfacing and works on barriers, signs, bridges, viaducts and the Bisde service area. Entries and exits should remain open on weekday daytime, but mainline capacity stays reduced. Any incident can therefore magnify an existing bottleneck. From 7 September 05:00 to 16 October 21:00, the A2 between Everdingen and Deil keeps three narrow lanes in each direction at 90 km/h; official extra travel time is about sixty minutes.



  • The period is 7 September 05:00 to 16 October 21:00.
  • Three narrow lanes remain in each direction.
  • The temporary limit is 90 km/h.
  • Official extra travel time is about sixty minutes.
  • From 7 September 05:00 to 16 October 21:00, the A2 between Everdingen and Deil keeps three narrow lanes in each direction at 90 km/h; official extra travel time is about sixty minutes.


Hokimi field note:Mark 7 September to 16 October as one continuous impact period now. If driving is necessary, avoid peaks and keep a one-hour margin. Schedule home-working or rail days before the first severe queue rather than changing only after a missed appointment.

Information verified on 18 August 2026 · Source1 · Source2

Check before you go

Dates, availability and external conditions can change. Confirm the latest information with the official source.

Why it may be useful

From 7 September 05:00 to 16 October 21:00, the A2 between Everdingen and Deil keeps three narrow lanes in each direction at 90 km/h; official extra travel time is about sixty minutes.

For users who want less searching and clearer information in English, Dutch or Chinese. Flights&Trans.

The A2 stays open but loses a lane for six weeks
This supporting visual comes from real media on this public item.

Plan the next step

You will be redirected to the merchant or source site.

  • Valid until2026-10-16
  • Confirm with the official sourcerijkswaterstaat.nl

Check final price and availability on the merchant site.

View details · rijkswaterstaat.nl

Some links are affiliate links. The price is unchanged for you; Hokimi may earn a commission if you buy after clicking through.

You Might Also Like

View all →
The A1 becomes a moving work zone todayALLOW 30 MINUTES

The A1 becomes a moving work zone today

Check direction and exit first

Utrecht rail works change route each dayPLAN EXTRA TIME

Utrecht rail works change route each day

Allow about 35 extra minutes

A reserve release is not a pump-price buttonNO GUARANTEED PUMP DROP

A reserve release is not a pump-price button

No kerosene is being released

Two September Eurostar weekends need different plansCHECK SEPTEMBER TRAIN

Two September Eurostar weekends need different plans

Cancelled first, limited next

TRAVELPC does not discount every route equallyBOOK BY 20 AUG

TRAVELPC does not discount every route equally

Check the destination band first

The small word “from” matters most hereASIA FARES FROM AMS

The small word “from” matters most here

Fix your week before comparing

Love this deal?

No comments yet — be the first!